Wylam, St Oswin 6: 20-0-20 in E MAP
Sunday: 09:15 to 10:00
Practice: Monday 19:30 to 21:00
Nearest Metro Station: Wylam is not on a Metro line, but there is a railway station at Wylam on the Tyne Valley Line.
Church History
The church was built in 1886 by R.J. Johnson. Largely built of snecked rubble with Lakeland slate roof. It has Nave and chancel, south porch, south tower, north vestry and organ chamber and is built in the Perpendicular style.
The 3-bay nave has first a timber porch with delicate tracery, then 2-light windows. There is a tall embattled tower with angle buttresses, 2-light bell openings and gargoyles It also acts as transept internally. 2-bay chancel with unusual Perpendicular tracery. The east and west windows are 5-light with panel tracery. There is an organ chamber and vestry, under catslide roof, also treated as transept internally. The gables are raised with ridged and roll-moulded coping. Wrought-iron vane on tower.
Interior: There is a canted barrel-vaulted wood panelled ceiling with carved bosses and frieze. Chancel ceiling is painted with Tudor roses and foliage and has carved relief frieze of vines. Pews, pulpit and doors have linenfold carving. There are screens and altar rails with panels of tracery and a traceried reredos.
Source: https://historicengland.org.uk/listing/the-list/list-entry/1044959

The interior of the church. Source: Northern Vicar
The Bells
The bells are a complete ring by Taylors, cast in 1885 and hung in 1886, at the time that the church was being built. They hang in a cast iron frame, layout 6.4 and truss 8.3.C.b – being “high-A frames”. They were overhauled 2004, when they were 8th turned. The front four bells have had their canons removed, the back two were cast with flat heads. This ring is the heaviest ring of 6 in the whole of the area covered by this website.
I cannot locate a report of the opening of the bells, but The “Bell News and Ringers’ Record” reported a visit to ring them in the edition of October 2nd 1886:

The bells were rehung in their existing frame in 2004 – I am looking for more details of what work as done – can you help?
The first peal on the bells was rung on October 1st 1898 and was reported in “Bell News and Ringers’ Record” thus:

1 5-1-24 30.50″ 1885 John Taylor & Co C# (5-2-4)
2 7-0-0 33.50″ 1885 John Taylor & Co B (7-0-0)
3 9-3-21 36.63″ 1885 John Taylor & Co A (10-0-10)
4 11-2-0 39.38″ 1885 John Taylor & Co G# (11-2-14)
5 14-1-0 43.50″ 1885 John Taylor & Co F# (14-2-14)
6 22-0-20 49.25″ 1885 John Taylor & Co E (22-1-4)
(Figures in brackets are the “as cast” weights)
Inscriptions
- J. TAYLOR & CO BELLFOUNDERS LOUGHBOROUGH LEICESTERSHIRE 1885
- J. TAYLOR & CO BELLFOUNDERS LOUGHBOROUGH LEICESTERSHIRE 1885
- J. TAYLOR & CO BELLFOUNDERS LOUGHBOROUGH LEICESTERSHIRE 1885
- J. TAYLOR & CO BELLFOUNDERS LOUGHBOROUGH LEICESTERSHIRE 1885
- J. TAYLOR & CO BELLFOUNDERS LOUGHBOROUGH LEICESTERSHIRE 1885
- J. TAYLOR & CO BELLFOUNDERS LOUGHBOROUGH LEICESTERSHIRE 1885
The frame layout

